If the scheduled recording has been changed or is incorrect, the best option is to edit the one you created beforehand rather than creating a new one.
Here is the detailed procedure:
- Go to the Schedule tab.
- Find the record you want to edit.
- Tap Edit on the top right corner of the screen.
- Modify the fields of your choice.
- Tap Save on the top right corner of the screen.
- After a few seconds, you get a message confirming that the recording has been adapted according to your modifications.
A recording that has already started can no longer be moved or modified, with the exception of the end of recording parameter, which we advise you to use if a recording continues to operate after the event has ended.
Comments
0 comments
Please sign in to leave a comment.